SERVICES OVERVIEW
services
PROCON E&C self-performs specialty scopes for industrial and advanced manufacturing facilities, with project experience in 16 states, in five groups: cleanroom and HVAC; electrical, controls and low-voltage systems; equipment installation and hook-up; specialty envelope and architectural metal; and BIM / VDC. Our crews work inside operating and mission-critical facilities under a Georgia Electrical Contractor, Class II (Unrestricted) license and OSHA-trained safety supervision.
+ PRECONSTRUCTION
+ SELF-PERFORM
DIV 13_SPECIAL CONSTRUCTION
- Cleanrooms: from ISO Class 8 support areas to semiconductor fab cleanrooms at the highest cleanliness classes (ISO 14644)
- Modular Wall and Ceiling Panel Systems
- System Ceilings and Walkable Grids
- Fan Filter Units (FFU)
- Raised Access Floor
- Air Showers and Pass-Throughs
- Cleanroom Lighting Systems
- AMHS, tool setting and hook-up: see Equipment Installation & Hook-up →
DIV 26_ELECTRICAL
- Georgia Electrical Contractor, Class II (Unrestricted)
- Power Distribution, Busway and Feeders
- Motor Control Centers (MCC) and Variable Frequency Drives (VFD)
- Underground and Site Electrical: Duct Banks and Feeders
- Switchgear, Panelboards, and Transformers
- Equipment Power Hook-up
- Grounding, Bonding and Surge Protection (SPD); Facility Lighting
- Communications, instrumentation, controls and security: see Low-Voltage Systems below
DIV 25 · 27 · 28_LOW-VOLTAGE SYSTEMS
- Communications: Fiber, Structured Cabling, IDF / MDF, Wi-Fi, PA
- Instrumentation: Field Instruments, Tubing, I&C Tray, Loop Checks
- Controls: Control Panels, I/O, FMS / BMS, PLC / DCS and HMI Programming
- Security: CCTV, Access Control, Intrusion, Construction-Phase Site Security
DIV 07_SPECIALTY ENVELOPE SYSTEMS
- Insulated Metal Panels (IMP)
- Metal Cladding / ACM Panels
- Roof and Wall Panel Systems
- Fiber Cement Panels
- Flashing and Sheet Metal
DIV 08_SPECIALTY OPENINGS
- Cleanroom Doors and Windows
- High-Performance Industrial Doors
- Skylights and Structural Glazing
- Industrial Louvers and Vents
- Storefront Systems and Interior Glass Partitions
- Door and Window Hardware
- Oversized skylights and louvers: see how we plan the lift →
DIV 23_HEATING, VENTILATING
AND AIR CONDITIONING (HVAC)
- HVAC Piping Systems
- Ductwork and Air Distribution
- Equipment Installation and Hook-up
- Pumps, Valves, and Mechanical Systems
- HVAC Insulation
- AHU, MAU, DCC and Exhaust Fan Setting; Scrubber Exhaust Ducting
- TAB by others, coordinated by PROCON


















WHY PROCON
About PROCON →One integrated team
Cleanroom architecture, electrical and controls, HVAC, AMHS, and equipment setting and hook-up under one contract.
Fewer interface gaps, no finger-pointing between trades, fewer delays. →
Self-perform workforce
About 110 people, with work-authorized W-2 crews from PROCON group companies, so PROCON controls mobilization and schedule.
Korean experience, U.S. codes
Bilingual Korean–English teams bring experience from Korean advanced-manufacturing plants and build to U.S. codes and practice.
TALK TO OUR TEAM
Send us the facility, the scope and the schedule. We route it to the division that will build it, and reply within one business day.