- What electrical work do you self-perform?
- Power distribution from the switchboard to the equipment disconnect: switchgear and main switchboards, dry-type transformers, busway, feeders and branch wiring, underground duct banks and site feeders, motor control centers (MCC) and variable frequency drives (VFD), UPS and battery systems, equipment power hook-up, cable tray and raceway, grounding, bonding and surge protection (SPD), facility lighting, and lighting power for cleanrooms and server rooms.
- What licenses do you hold?
- Georgia Electrical Contractor, Class II (Unrestricted). Georgia Commercial General Contractor license. Electrical and general contractor licensing across multiple U.S. states, with additional states added to match project locations.
- Have you built data center electrical?
- Yes. At LGES Georgia in Ellabell we delivered the battery plant's complete IT data center and server room, including electrical, for the plant's construction contractor. The electrical work covered switchgear, busway, UPS and batteries, a dry-type transformer, power and communication cable tray, grounding, server-room lighting and facility monitoring.
- Can you wire FFUs and cleanroom lighting?
- Yes. At SK hynix Indiana we carry FFU power and communication wiring, the FFU communication duct and lighting fixture power connections as part of the cleanroom system ceiling package.
- Do you test and turn over your work?
- Yes, as turnover support. We test our own installation within the contract scope, label it, mark up the as-builts and deliver the turnover documents.
- What is outside your scope?
- Utility service and fire alarm are by others. We test within our contract scope, label, document and support the turnover.