CLEANROOM & HVAC
cleanroom
Cleanrooms are the core of PROCON E&C’s self-perform work. From ISO Class 8 support areas to semiconductor fab cleanrooms at the highest cleanliness classes (ISO 14644), we build the envelope, ceiling, floor and air path as one system, and we install the doors, pass-throughs and lighting that keep the classification intact. Our own crews also set the HVAC equipment and run the ductwork that feeds the room, and the same crews serve semiconductor, chemical and life science plants and data centers.
+ CLEANROOM SYSTEMS
13_CLEANROOM CLASSIFICATION
- Classified to ISO 14644
- From ISO Class 8 support areas
- To semiconductor fab cleanrooms at the highest cleanliness classes
- Classified anteroom and gowning sequences
13_WALL & CEILING SYSTEMS
- Modular wall panel systems
- System ceilings and walkable grids
- Walkable ceiling systems
- Sealed penetrations and envelope integrity
- Cleanroom doors and windows
13_FLOOR SYSTEMS
- Raised access floor
- Perforated and grated panels
- Epoxy and resinous flooring with coved bases
- Under-floor plenum coordination
+ AIR & ACCESS
13_FAN FILTER UNITS (FFU)
- FFU layout and installation
- HEPA / ULPA filtration
- Plenum and return air path
- Coordination with the balancing (TAB) contractor
13_AIR SHOWERS & PASS-THROUGHS
- Air showers
- Pass-throughs
- Material and personnel airlocks
- Interlock and control rough-in
13_CLEANROOM LIGHTING
- Sealed cleanroom lighting systems
- Integration with ceiling grid
- Emergency and egress lighting
+ HVAC
23_HVAC EQUIPMENT
- Air handling units (AHU) and makeup air units (MAU)
- Fan filter units (FFU) and dry cooling coils (DCC)
- Exhaust fans
- Equipment setting (rigging and placement) and connection to duct, piping and power
- How we receive, set and hook up equipment: Equipment Installation & Hook-up →
23_DUCTWORK & EXHAUST
- Supply, return and exhaust ductwork, hangers, supports and dampers
- Scrubber exhaust ducting
- Cleanroom air distribution: plenums, returns and low-wall returns
- Intake and exhaust louvers
23_INDUSTRIAL HVAC
- Industrial HVAC and ductwork outside the cleanroom, such as battery plants
- HVAC ductwork installed at a battery plant in Ellabell, GA
- Precision cooling (CRAC) units in IT rooms
- TAB by others; we coordinate the interfaces
+ APPLICATIONS
13_SEMICONDUCTOR & ELECTRONICS
- Fab and sub-fab environments
- System ceiling packages
- Tool setting and hook-up (power, controls, process piping)
- Communications, I&C and security in the fab: Low-Voltage Systems →
- AMHS, tool setting and hook-up: Equipment Installation & Hook-up →
13_CHEMICAL & ELECTRONIC MATERIALS
- Process cleanrooms for chemical and electronic materials
- Expansions inside operating plants
13_DATA CENTERS
- Raised access floor systems
- Containment and airflow separation
- Mission-critical coordination
13_LIFE SCIENCE
- cGMP manufacturing environments
- Laboratory and QC spaces















Concept video
Videos
Concept videos of how PROCON E&C builds cleanrooms and integrated electrical, controls and low-voltage systems, and how it plans specialty lifts.
1 min 16 sSemiconductor Cleanroom Construction: System Ceiling and Overhead AMHSHow PROCON E&C builds a semiconductor cleanroom: the access floor leveled to a floor datum, anchor bolts and threaded rods, the ceiling grid leveled to the same datum, gel-seal FFUs coplanar with the grid, AMHS rails hung from the main tees, tool setting, and tool power and process hook-up from below.
1 min 37 sChemical and Biopharmaceutical Cleanroom ConstructionHow PROCON E&C builds a chemical and biopharmaceutical cleanroom: layout and the floor track, the walkable ceiling first, wall panels fastened to the ceiling, doors, flush windows and pass-throughs, above-ceiling MEP and terminal HEPA housings, utilities from the interstitial space, sealing, and turnover support.WHY PROCON
About PROCON →One integrated team
Cleanroom architecture, electrical and controls, HVAC, AMHS, and equipment setting and hook-up under one contract.
Fewer interface gaps, no finger-pointing between trades, fewer delays. →
Korean experience, U.S. codes
Bilingual Korean–English teams bring experience from Korean advanced-manufacturing plants and build to U.S. codes and practice.
Digital project delivery
In-house BIM resolves clashes before installation, and our own project management platform logs site activity the same day.
Clients see site status the same day and get closeout documents faster. →
COMMON QUESTIONS
FAQ.
- What cleanroom systems do you install (system ceiling, FFU)?
- We self-perform the full cleanroom envelope: modular wall panels, system ceilings and walkable grids, fan filter units (FFU) with HEPA or ULPA filters, and raised access floor. We also install cleanroom doors and windows, air showers, pass-throughs and sealed cleanroom lighting, and we build the walls, ceiling, floor and air path as one system.
- What cleanroom classes do you build?
- Under ISO 14644, from ISO Class 8 support areas to semiconductor fab cleanrooms at the highest cleanliness classes, including classified anterooms and gowning sequences. We seal penetrations to keep the envelope tight and coordinate with the balancing (TAB) contractor.
- Do you self-perform cleanroom HVAC?
- Yes. We set and connect AHUs and MAUs, FFUs, dry cooling coils (DCC) and exhaust fans, and install supply, return and exhaust ductwork, scrubber exhaust ducting and louvers. We also build industrial HVAC and ductwork outside the cleanroom, such as in battery plants. TAB is by others.
- Have you built system ceilings in semiconductor fabs?
- Yes. Recent work includes cleanroom system ceiling packages for SK hynix in West Lafayette, Indiana and Amkor in Arizona, and system ceiling grid, blind panels and FFU at a semiconductor fab in Taylor, Texas. The same crews also work in data centers and life science facilities.
- Can you also handle electrical and low-voltage systems inside the cleanroom?
- Yes. Electrical and low-voltage systems (communications, I&C and security) are PROCON self-perform scopes, so one contractor can carry the cleanroom envelope and the systems inside it. Fire alarm and utility service are by others; we coordinate those interfaces.
- Where do you work?
- Across the United States. We are headquartered in Buford, Georgia, have project experience in 16 states, and hold electrical and general contractor licensing across multiple states, including a Georgia Electrical Contractor license (Class II, Unrestricted) and a Georgia Commercial General Contractor license.
- How do you handle safety (OSHA 10/30/500, EMR, drug testing, E-Verify)?
- Our policy is OSHA 10 for every field worker, OSHA 30 for foremen and OSHA 500-level training for safety managers. Our EMR is 0.92, and we run drug testing and use E-Verify.
TALK TO THE CLEANROOM TEAM
Send us the classification, the footprint and the schedule. The cleanroom team replies within one business day.