EN|KO
Fiber raceway and power drops over the server racks

CASE STUDY · DATA CENTER · FULL-ROOM SCOPE

IT Data Center & Server Room

LG Energy Solution · LGES Georgia battery plant · Ellabell, GA

At the LGES Georgia battery plant in Ellabell, PROCON E&C delivered the complete IT data center and server room, including electrical, for the plant’s construction contractor. Our crews self-performed the electrical work, from switchgear, busway and UPS to the dry-type transformer, cable tray, grounding, server-room lighting and facility monitoring, and built the room itself: partitions, epoxy flooring and precision cooling (CRAC) units. The access floor was installed by a specialty partner under PROCON’s contract.

PROJECT FACTS

Location
Ellabell, GA
Owner
LGES Georgia
Facility
IT data center and server room in a battery plant
Sector
Battery manufacturing · Data centers
PROCON role
Complete IT data center and server room, including electrical, under the plant’s construction contractor
Status
Completed · 2024 – 2025
Scope
Switchgear, feeders and branch wiring, busway, UPS and batteries, dry-type transformer, power and communication cable tray, grounding, server-room lighting, facility monitoring (FMS), partitions, epoxy flooring, CRAC units, access floor (specialty partner)

Owners are named for identification only; this does not imply their endorsement.

THE CHALLENGE

ONE ROOM, EVERY TRADE

Power that cannot drop

The racks sit behind switchgear, busway and UPS, so the power path has to be built and labeled as one system.

Trades stacked in one room

Busway, power and communication tray, ladder tray, lighting and the CRAC units share the same room and the same overhead space.

One finish date

Power, cooling, the floor and the room finishes have to come together so the IT equipment can move in on schedule.

WHAT WE DID

ONE CONTRACT FOR THE ROOM

Under the plant’s construction contractor, PROCON held one contract for the whole room and coordinated every trade in it, self-performing everything except the access floor.

  1. 01

    Power distribution

    Switchgear installation, feeders and branch wiring, and busway.

  2. 02

    UPS and transformer

    UPS and battery installation, and a dry-type transformer.

  3. 03

    Cable tray and grounding

    Power and communication cable tray, aluminum ladder tray, and grounding.

  4. 04

    Lighting and monitoring

    Server-room lighting and facility monitoring (FMS).

  5. 05

    The room

    Partitions, epoxy flooring and precision cooling (CRAC) units, built by our own crews.

  6. 06

    Access floor

    Raised access floor installed by a specialty partner under PROCON’s contract, coordinated by PROCON with the rest of the room.

ON SITE

FROM THE JOBSITE

Aluminum ladder tray dropping into the switchgear and UPS cabinets
Aluminum ladder tray dropping into the switchgear and UPS cabinets
Ladder tray runs overhead
Ladder tray runs overhead
Access floor pedestals and open tiles before the cabinets were set
Access floor pedestals and open tiles before the cabinets were set

RESULT

WHAT WAS DELIVERED

  • The complete IT data center and server room, including electrical, delivered under one PROCON contract with the plant’s construction contractor
  • Electrical self-performed, from switchgear and UPS to lighting and FMS
  • Room build-out self-performed: partitions, epoxy flooring and CRAC units; access floor by a specialty partner under PROCON’s contract

This is PROCON’s data center reference, built by the same crews that work in fabs and battery plants.

KEEP EXPLORING

PLANNING A SIMILAR JOB?

Send us the facility, the scope and the schedule. We reply from info@proconus.com, usually within one business day.

HEADQUARTERS

2703 Brickton North Dr
Buford, GA 30518